{"id":34656,"date":"2024-09-09T11:51:58","date_gmt":"2024-09-09T09:51:58","guid":{"rendered":"https:\/\/www.gesi.de\/end-of-the-transition-period-the-pcn-requirement-will-apply-to-all-hazardous-mixtures-from-2025\/"},"modified":"2025-07-23T15:51:05","modified_gmt":"2025-07-23T13:51:05","slug":"end-of-the-transition-period-the-pcn-requirement-will-apply-to-all-hazardous-mixtures-from-2025","status":"publish","type":"post","link":"https:\/\/www.gesi.de\/en\/end-of-the-transition-period-the-pcn-requirement-will-apply-to-all-hazardous-mixtures-from-2025\/","title":{"rendered":"End of the transition period: the PCN requirement will apply to all hazardous mixtures from 2025"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">The European Poison Centres Notification (PCN) is already firmly established for many manufacturers, formulators and distributors.\nNevertheless, there is still a proportion of products that do not yet have a UFI on the label, even though the obligation to indicate it would be there.\nThe reason for this is a transitional regulation that will no longer apply from 2025.\nI am taking this change as an opportunity to summarize the PCN obligation here for all those affected and newcomers.   <\/p>\n\n<h2 class=\"wp-block-heading\">Where does the PCN obligation come from?<\/h2>\n\n<p class=\"wp-block-paragraph\">The obligation to prepare PCNs can be found in Article 45 of the CLP Regulation.\nDetails of the content and further information can be found in Annex VIII. Tip: ECHA guidance is available in the sources. <\/p>\n\n<h2 class=\"wp-block-heading\">Which products are affected?<\/h2>\n\n<p class=\"wp-block-paragraph\">All products that are a mixture of substances and have a physico-chemical classification or a health classification according to the CLP Regulation.\nPictograms therefore appear on the label, with the exception of environmental hazards (tree and fish).\nIf you want to be absolutely sure, pay attention to the H-phrases: If H-phrases occur with H2XX or H3XX, then the label should include a UFI (unique formulation identifier) and a PCN should exist for the product.\nException: There is only a classification for gases under pressure and \/ or explosive classifications (these have other requirements outside the PCN).   <\/p>\n\n<p class=\"wp-block-paragraph\">From 2025, it will therefore be easy for both authorities and customers to understand whether a UFI should be on the hazardous substance label or not.<\/p>\n\n<h2 class=\"wp-block-heading\">Who has to report?<\/h2>\n\n<p class=\"wp-block-paragraph\">Any manufacturer \/ formulator who places the affected mixtures on the market, i.e. transfers them to another company, a dealer, private individuals, etc..\nIt is not decisive whether money was charged for the product. <\/p>\n\n<p class=\"wp-block-paragraph\">The UFI must already be included on the label for the mixtures concerned and the notification must be submitted to the relevant member states.<\/p>\n\n<p class=\"wp-block-paragraph\">Traders should ensure that their goods have the UFI if necessary and that the PCN has been provided for all member countries concerned.\nAlternatively, they can also self-report.\nIn detail, the obligations for traders with PCNs differ from member state to member state, so those affected should read more carefully here.  <\/p>\n\n<h2 class=\"wp-block-heading\">How does the message work?<\/h2>\n\n<p class=\"wp-block-paragraph\">PCN is a purely electronic format.\nIt is possible to record the product data using the IUCLID 6 software provided by ECHA and send it to the ECHA portal as a PCN. <\/p>\n\n<p class=\"wp-block-paragraph\">However, for users of SDS creation software, such as GeSi\u00b3 from our company, it is usually easier to create the PCN directly with this software.\nMuch of the information is necessary for the creation of safety data sheets anyway and there is even the option of sending the PCN directly from the software to the ECHA portal using the System 2 system.\nCreating them in this way not only saves time, but also the tedious insertion of translations and guarantees the uniqueness of the software-generated UFI for the products.  <\/p>\n\n<p class=\"wp-block-paragraph\">Sources:<\/p>\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/eur-lex.europa.eu\/eli\/reg\/2008\/1272\/2023-12-01\"><em>[1]<\/em><\/a><em> CLP Regulation on EUR-Lex (Regulation (EC) No 1272\/2008)<\/em><\/p>\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/poisoncentres.echa.europa.eu\/de\/home\"><em>[2]<\/em><\/a><em> Poison Centers page of the ECHA<\/em><\/p>\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/echa.europa.eu\/de\/guidance-documents\/guidance-on-clp\"><em>[3]<\/em><\/a><em> Guidance on compliance with Annex VIII of the CLP Regulation (ECHA)<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The European Poison Centres Notification (PCN) is already firmly established for many manufacturers, formulators and distributors. Nevertheless, there is still a proportion of products that do not yet have a [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":34190,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_price":"","_stock":"","_tribe_ticket_header":"","_tribe_default_ticket_provider":"","_tribe_ticket_capacity":"0","_ticket_start_date":"","_ticket_end_date":"","_tribe_ticket_show_description":"","_tribe_ticket_show_not_going":false,"_tribe_ticket_use_global_stock":"","_tribe_ticket_global_stock_level":"","_global_stock_mode":"","_global_stock_cap":"","_tribe_rsvp_for_event":"","_tribe_ticket_going_count":"","_tribe_ticket_not_going_count":"","_tribe_tickets_list":"[]","_tribe_ticket_has_attendee_info_fields":false,"footnotes":""},"categories":[1167],"tags":[],"class_list":["post-34656","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-pcn-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>End of the transition period: PCN for hazardous mixtures - GeSi<\/title>\n<meta name=\"description\" content=\"The PCN obligation and UFI will be mandatory for all hazardous mixtures. Find out which products are affected and how the notification is made.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.gesi.de\/en\/end-of-the-transition-period-the-pcn-requirement-will-apply-to-all-hazardous-mixtures-from-2025\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"End of the transition period: PCN for hazardous mixtures - GeSi\" \/>\n<meta property=\"og:description\" content=\"The PCN obligation and UFI will be mandatory for all hazardous mixtures. Find out which products are affected and how the notification is made.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.gesi.de\/en\/end-of-the-transition-period-the-pcn-requirement-will-apply-to-all-hazardous-mixtures-from-2025\/\" \/>\n<meta property=\"og:site_name\" content=\"GeSi\" \/>\n<meta property=\"article:published_time\" content=\"2024-09-09T09:51:58+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-07-23T13:51:05+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.gesi.de\/wp-content\/uploads\/2024\/09\/ende-der-uebergangsfrist-pcn-pflicht.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Philip Stefl\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Philip Stefl\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.gesi.de\\\/en\\\/end-of-the-transition-period-the-pcn-requirement-will-apply-to-all-hazardous-mixtures-from-2025\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.gesi.de\\\/en\\\/end-of-the-transition-period-the-pcn-requirement-will-apply-to-all-hazardous-mixtures-from-2025\\\/\"},\"author\":{\"name\":\"Philip Stefl\",\"@id\":\"https:\\\/\\\/www.gesi.de\\\/en\\\/#\\\/schema\\\/person\\\/ffb3a53e1036a512a9a2ecba0d9a364e\"},\"headline\":\"End of the transition period: the PCN requirement will apply to all hazardous mixtures from 2025\",\"datePublished\":\"2024-09-09T09:51:58+00:00\",\"dateModified\":\"2025-07-23T13:51:05+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.gesi.de\\\/en\\\/end-of-the-transition-period-the-pcn-requirement-will-apply-to-all-hazardous-mixtures-from-2025\\\/\"},\"wordCount\":523,\"publisher\":{\"@id\":\"https:\\\/\\\/www.gesi.de\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.gesi.de\\\/en\\\/end-of-the-transition-period-the-pcn-requirement-will-apply-to-all-hazardous-mixtures-from-2025\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.gesi.de\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/ende-der-uebergangsfrist-pcn-pflicht.jpg\",\"articleSection\":[\"PCN\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.gesi.de\\\/en\\\/end-of-the-transition-period-the-pcn-requirement-will-apply-to-all-hazardous-mixtures-from-2025\\\/\",\"url\":\"https:\\\/\\\/www.gesi.de\\\/en\\\/end-of-the-transition-period-the-pcn-requirement-will-apply-to-all-hazardous-mixtures-from-2025\\\/\",\"name\":\"End of the transition period: PCN for hazardous mixtures - GeSi\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.gesi.de\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.gesi.de\\\/en\\\/end-of-the-transition-period-the-pcn-requirement-will-apply-to-all-hazardous-mixtures-from-2025\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.gesi.de\\\/en\\\/end-of-the-transition-period-the-pcn-requirement-will-apply-to-all-hazardous-mixtures-from-2025\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.gesi.de\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/ende-der-uebergangsfrist-pcn-pflicht.jpg\",\"datePublished\":\"2024-09-09T09:51:58+00:00\",\"dateModified\":\"2025-07-23T13:51:05+00:00\",\"description\":\"The PCN obligation and UFI will be mandatory for all hazardous mixtures. Find out which products are affected and how the notification is made.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.gesi.de\\\/en\\\/end-of-the-transition-period-the-pcn-requirement-will-apply-to-all-hazardous-mixtures-from-2025\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.gesi.de\\\/en\\\/end-of-the-transition-period-the-pcn-requirement-will-apply-to-all-hazardous-mixtures-from-2025\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.gesi.de\\\/en\\\/end-of-the-transition-period-the-pcn-requirement-will-apply-to-all-hazardous-mixtures-from-2025\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.gesi.de\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/ende-der-uebergangsfrist-pcn-pflicht.jpg\",\"contentUrl\":\"https:\\\/\\\/www.gesi.de\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/ende-der-uebergangsfrist-pcn-pflicht.jpg\",\"width\":1200,\"height\":630,\"caption\":\"\u00a9 GeSi Software GmbH\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.gesi.de\\\/en\\\/end-of-the-transition-period-the-pcn-requirement-will-apply-to-all-hazardous-mixtures-from-2025\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home page\",\"item\":\"https:\\\/\\\/www.gesi.de\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"End of the transition period: the PCN requirement will apply to all hazardous mixtures from 2025\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.gesi.de\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.gesi.de\\\/en\\\/\",\"name\":\"GeSi\",\"description\":\"Ihre Software f\u00fcr Sicherheitsdatenbl\u00e4tter, Gefahrstoffe, Arbeitssicherheit\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.gesi.de\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.gesi.de\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.gesi.de\\\/en\\\/#organization\",\"name\":\"GeSi\",\"url\":\"https:\\\/\\\/www.gesi.de\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.gesi.de\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.gesi.de\\\/wp-content\\\/uploads\\\/2023\\\/12\\\/Logo-original-RGB.png\",\"contentUrl\":\"https:\\\/\\\/www.gesi.de\\\/wp-content\\\/uploads\\\/2023\\\/12\\\/Logo-original-RGB.png\",\"width\":282,\"height\":96,\"caption\":\"GeSi\"},\"image\":{\"@id\":\"https:\\\/\\\/www.gesi.de\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.gesi.de\\\/en\\\/#\\\/schema\\\/person\\\/ffb3a53e1036a512a9a2ecba0d9a364e\",\"name\":\"Philip Stefl\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d22db1a56a5e3cb0af20b4150a8fe754cebf881ab1617ad433439a7d09880b71?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d22db1a56a5e3cb0af20b4150a8fe754cebf881ab1617ad433439a7d09880b71?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d22db1a56a5e3cb0af20b4150a8fe754cebf881ab1617ad433439a7d09880b71?s=96&d=mm&r=g\",\"caption\":\"Philip Stefl\"},\"description\":\"M. Sc. Philip Jorge Stefl (Chemieingenieur), Legal Compliance \\\/ Produktentwicklung GeSi\u00b3\",\"url\":\"https:\\\/\\\/www.gesi.de\\\/en\\\/author\\\/pstefl\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"End of the transition period: PCN for hazardous mixtures - GeSi","description":"The PCN obligation and UFI will be mandatory for all hazardous mixtures. Find out which products are affected and how the notification is made.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.gesi.de\/en\/end-of-the-transition-period-the-pcn-requirement-will-apply-to-all-hazardous-mixtures-from-2025\/","og_locale":"en_US","og_type":"article","og_title":"End of the transition period: PCN for hazardous mixtures - GeSi","og_description":"The PCN obligation and UFI will be mandatory for all hazardous mixtures. Find out which products are affected and how the notification is made.","og_url":"https:\/\/www.gesi.de\/en\/end-of-the-transition-period-the-pcn-requirement-will-apply-to-all-hazardous-mixtures-from-2025\/","og_site_name":"GeSi","article_published_time":"2024-09-09T09:51:58+00:00","article_modified_time":"2025-07-23T13:51:05+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/www.gesi.de\/wp-content\/uploads\/2024\/09\/ende-der-uebergangsfrist-pcn-pflicht.jpg","type":"image\/jpeg"}],"author":"Philip Stefl","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Philip Stefl","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.gesi.de\/en\/end-of-the-transition-period-the-pcn-requirement-will-apply-to-all-hazardous-mixtures-from-2025\/#article","isPartOf":{"@id":"https:\/\/www.gesi.de\/en\/end-of-the-transition-period-the-pcn-requirement-will-apply-to-all-hazardous-mixtures-from-2025\/"},"author":{"name":"Philip Stefl","@id":"https:\/\/www.gesi.de\/en\/#\/schema\/person\/ffb3a53e1036a512a9a2ecba0d9a364e"},"headline":"End of the transition period: the PCN requirement will apply to all hazardous mixtures from 2025","datePublished":"2024-09-09T09:51:58+00:00","dateModified":"2025-07-23T13:51:05+00:00","mainEntityOfPage":{"@id":"https:\/\/www.gesi.de\/en\/end-of-the-transition-period-the-pcn-requirement-will-apply-to-all-hazardous-mixtures-from-2025\/"},"wordCount":523,"publisher":{"@id":"https:\/\/www.gesi.de\/en\/#organization"},"image":{"@id":"https:\/\/www.gesi.de\/en\/end-of-the-transition-period-the-pcn-requirement-will-apply-to-all-hazardous-mixtures-from-2025\/#primaryimage"},"thumbnailUrl":"https:\/\/www.gesi.de\/wp-content\/uploads\/2024\/09\/ende-der-uebergangsfrist-pcn-pflicht.jpg","articleSection":["PCN"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.gesi.de\/en\/end-of-the-transition-period-the-pcn-requirement-will-apply-to-all-hazardous-mixtures-from-2025\/","url":"https:\/\/www.gesi.de\/en\/end-of-the-transition-period-the-pcn-requirement-will-apply-to-all-hazardous-mixtures-from-2025\/","name":"End of the transition period: PCN for hazardous mixtures - GeSi","isPartOf":{"@id":"https:\/\/www.gesi.de\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.gesi.de\/en\/end-of-the-transition-period-the-pcn-requirement-will-apply-to-all-hazardous-mixtures-from-2025\/#primaryimage"},"image":{"@id":"https:\/\/www.gesi.de\/en\/end-of-the-transition-period-the-pcn-requirement-will-apply-to-all-hazardous-mixtures-from-2025\/#primaryimage"},"thumbnailUrl":"https:\/\/www.gesi.de\/wp-content\/uploads\/2024\/09\/ende-der-uebergangsfrist-pcn-pflicht.jpg","datePublished":"2024-09-09T09:51:58+00:00","dateModified":"2025-07-23T13:51:05+00:00","description":"The PCN obligation and UFI will be mandatory for all hazardous mixtures. Find out which products are affected and how the notification is made.","breadcrumb":{"@id":"https:\/\/www.gesi.de\/en\/end-of-the-transition-period-the-pcn-requirement-will-apply-to-all-hazardous-mixtures-from-2025\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.gesi.de\/en\/end-of-the-transition-period-the-pcn-requirement-will-apply-to-all-hazardous-mixtures-from-2025\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.gesi.de\/en\/end-of-the-transition-period-the-pcn-requirement-will-apply-to-all-hazardous-mixtures-from-2025\/#primaryimage","url":"https:\/\/www.gesi.de\/wp-content\/uploads\/2024\/09\/ende-der-uebergangsfrist-pcn-pflicht.jpg","contentUrl":"https:\/\/www.gesi.de\/wp-content\/uploads\/2024\/09\/ende-der-uebergangsfrist-pcn-pflicht.jpg","width":1200,"height":630,"caption":"\u00a9 GeSi Software GmbH"},{"@type":"BreadcrumbList","@id":"https:\/\/www.gesi.de\/en\/end-of-the-transition-period-the-pcn-requirement-will-apply-to-all-hazardous-mixtures-from-2025\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home page","item":"https:\/\/www.gesi.de\/en\/"},{"@type":"ListItem","position":2,"name":"End of the transition period: the PCN requirement will apply to all hazardous mixtures from 2025"}]},{"@type":"WebSite","@id":"https:\/\/www.gesi.de\/en\/#website","url":"https:\/\/www.gesi.de\/en\/","name":"GeSi","description":"Ihre Software f\u00fcr Sicherheitsdatenbl\u00e4tter, Gefahrstoffe, Arbeitssicherheit","publisher":{"@id":"https:\/\/www.gesi.de\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.gesi.de\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.gesi.de\/en\/#organization","name":"GeSi","url":"https:\/\/www.gesi.de\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.gesi.de\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.gesi.de\/wp-content\/uploads\/2023\/12\/Logo-original-RGB.png","contentUrl":"https:\/\/www.gesi.de\/wp-content\/uploads\/2023\/12\/Logo-original-RGB.png","width":282,"height":96,"caption":"GeSi"},"image":{"@id":"https:\/\/www.gesi.de\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.gesi.de\/en\/#\/schema\/person\/ffb3a53e1036a512a9a2ecba0d9a364e","name":"Philip Stefl","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/d22db1a56a5e3cb0af20b4150a8fe754cebf881ab1617ad433439a7d09880b71?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d22db1a56a5e3cb0af20b4150a8fe754cebf881ab1617ad433439a7d09880b71?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d22db1a56a5e3cb0af20b4150a8fe754cebf881ab1617ad433439a7d09880b71?s=96&d=mm&r=g","caption":"Philip Stefl"},"description":"M. Sc. Philip Jorge Stefl (Chemieingenieur), Legal Compliance \/ Produktentwicklung GeSi\u00b3","url":"https:\/\/www.gesi.de\/en\/author\/pstefl\/"}]}},"_links":{"self":[{"href":"https:\/\/www.gesi.de\/en\/wp-json\/wp\/v2\/posts\/34656","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.gesi.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.gesi.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.gesi.de\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.gesi.de\/en\/wp-json\/wp\/v2\/comments?post=34656"}],"version-history":[{"count":1,"href":"https:\/\/www.gesi.de\/en\/wp-json\/wp\/v2\/posts\/34656\/revisions"}],"predecessor-version":[{"id":34657,"href":"https:\/\/www.gesi.de\/en\/wp-json\/wp\/v2\/posts\/34656\/revisions\/34657"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.gesi.de\/en\/wp-json\/wp\/v2\/media\/34190"}],"wp:attachment":[{"href":"https:\/\/www.gesi.de\/en\/wp-json\/wp\/v2\/media?parent=34656"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.gesi.de\/en\/wp-json\/wp\/v2\/categories?post=34656"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.gesi.de\/en\/wp-json\/wp\/v2\/tags?post=34656"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}